Services

Navigating the FCC Robotics Restrictions

On July 28, 2026, the FCC added foreign-produced advanced robotic devices to its Covered List, restricting new equipment authorizations for robots built outside the U.S.

Fresh helps companies understand what’s covered, plan around it, and keep building with a domestic path forward.


Schedule a Discovery Call
Harmony_Full-width-1412×784-Enhanced
Physical AI Robotics

Support and expertise for an evolving robotics landscape

Traditionally robotic teams built manufacturing and sourcing relationships based on components and product road maps provided by a global supply chain. For Advanced Robotic Devices (ARD), this changed on July 28, 2026, when the FCC added foreign-produced advanced robotic devices (and relatedly, Connected Power Inverters) to its Covered List.

So what does that mean for robotics companies? Under the new rule, robots built outside the U.S. generally can’t get the FCC authorization needed to import, market, or sell them here, unless they qualify for a Conditional Approval or meet a U.S.-sourcing threshold.

Fresh has spent years designing and building custom robotics domestically, with U.S.-owned IP and full visibility into sourcing. We help you figure out the real path forward, not guesswork.

Talk with an Expert

Ready to get started?

Tell us about your project or current challenges. We'll help you define and adopt a strategic path forward.

  • By submitting this form, you agree to Fresh Consulting’s Privacy Policy
Covered List Screening
Service Offerings

Covered List screening & ARD classification

Determine whether current or planned products meet the FCC’s definition of an advanced robotic device, connected power inverter, or related covered technology. Fresh can help map exposure across the product portfolio and identify which products are likely:

  • In-scope
  • Out-of-scope
  • Excluded
  • In need of deeper regulatory review
Supply Chain Mapping
Service Offerings

BOM & Supply Chain Mapping

Create clarity where compliance, sourcing, and continuity risks exist and where mitigation planning may be required. Fresh engineers build clear technical maps of product exposure across the full bill of materials, including:

  • Country of origin
  • Sole-source dependencies
  • Supplier criticality
  • Beneficial ownership
  • Manufacturing and test locations
  • Contingency options
Firmware, Software, and Domestic IP
Service Offerings

Firmware, Software & Domestic IP Development

Reduce dependence on foreign-controlled firmware, embedded software, autonomy stacks, command/control paths, data collection services, cloud integrations, or AI/ML model components. Fresh can support:

  • Clean-sheet development
  • Architecture refactoring
  • Source-code ownership strategy
  • Documentation
  • Validation
  • Long-term maintainability
Industrial AMR
Service Offerings

Conditional Approval Package Support

Help prepare the technical and operational evidence needed for Conditional Approval review for DoW or DHS. This includes:

  • Evidence organization
  • Technical narratives
  • Product architecture documentation
  • BOM and supply-chain summaries
  • Firmware and software provenance
  • Risk gaps
  • Contingency plans
  • Executive-ready submission materials
Compliant Product Dev
Service Offerings

Compliant Product Development & Migration

Translate regulatory requirements into practical engineering roadmaps. Fresh can define:

  • Architecture changes
  • Trusted-supplier substitutions
  • Firmware and software migration plans
  • Cybersecurity controls
  • Verification plans
  • Phased transition strategies for current or next-generation products
US Manufacturing
Service Offerings

U.S. Manufacturing & Onshoring Planning

Develop a credible, time-bound roadmap toward domestic end-product status where needed. Fresh can support:

  • Assembly strategy
  • Supplier qualification
  • DFM/DFA
  • Pilot builds
  • Production test
  • End-of-line validation
  • Facilities requirements
  • Cost/schedule tradeoffs
  • Transition planning for U.S.-based manufacturing or final assembly

FCC Robotics Restrictions FAQ

Mobile, ground-based robots—including autonomous mobile robots, humanoids, and quadrupeds—that operate away from a human operator, weigh over 4.4 lbs combined with any dock or ground station, and include a sensor, network connectivity, and software controlling navigation, perception, or remote command. Fixed industrial arms (SCARA, Cartesian, articulated) are excluded.

National security agencies determined that foreign-produced robots pose supply chain and cybersecurity risks—including the potential for remote data collection, surveillance, or remote commandeering—that outweigh the benefit of continued market access.

The rule is based on production location, not company nationality or ownership. A U.S.-headquartered company can still be affected if its devices are manufactured abroad, and a foreign-headquartered company with true U.S. final assembly may qualify for an exemption.

Under the Buy American Act (48 CFR §25.101(a)), a domestic end product must be manufactured in the U.S. with more than 65% of component cost from U.S. sources through 2028 (rising to 75% in 2029). Devices meeting this threshold fall outside the FCC's "foreign-produced" definition.

The FCC's determination specifically targets mobile, networked, sensor-equipped devices capable of operating away from a human operator—the characteristics tied to the data-collection and remote-access risks cited in the national security determination. Fixed, non-mobile industrial robots don't present the same risk profile and are explicitly excluded.

Manufacturers can apply to the Department of War for a Conditional Approval, providing detailed disclosure of corporate ownership, supply chain, manufacturing locations, and a time-bound U.S. onshoring plan. Approval isn't guaranteed, and applications are due by January 1, 2028.

Conditional Approval depends on an individualized government risk determination with no fixed timeline or guarantee. Meeting the domestic end product threshold is a defined, verifiable standard a company controls directly, which is why many teams treat onshoring as the longer-term strategy even if they also pursue Conditional Approval in the near term.

The restriction is forward-looking. Previously authorized devices can continue to be sold, imported, and used, and software or firmware updates for those devices remain permitted under a separate FCC waiver through at least January 1, 2029.

Supply chain and manufacturing changes—sourcing new component vendors, shifting final assembly, or preparing a Conditional Approval application—take months to years to execute. Companies that start now have more runway than those who wait for a compliance deadline to force the decision.

"Foreign-produced" refers to where a device is manufactured, not who owns or controls the company making it. A U.S.-owned company manufacturing abroad is still foreign-produced; a foreign-owned company with genuine U.S. final assembly meeting the domestic content threshold is not.

Fresh reviews a device's full bill of materials for country-of-origin transparency, flagging single-source dependencies and foreign-sourced components that could jeopardize domestic end product status or complicate a Conditional Approval application.

Retrofitting a foreign-produced platform to meet U.S. content thresholds after the fact is often more expensive and less reliable than designing for domestic sourcing from the start. Additionally, it doesn't resolve questions about existing firmware, IP ownership, or software provenance that also factor into risk assessments.